PROPOSED NYAYO ESTATE EMBAKASI FOR NSSF – [PHASE 2 – 6]
- [Phase II & Phase III] – 1581 housing units
- [Phase IV & Phase V] – 1362 housing units
- [Phase VI] – commercial & recreational centres
MultiScope Consulting Engineers were commissioned to carry out supervision for civil engineering works as shown hereafter;
Roads, Footpaths, Parking and Drainage
Roads and drainage involving approximately 24 Km of open channel surface run-off drainage channels, 170,000 M2 of paved internal roads and parking to bitumen standards.
Sewerage
Sewer lines of total approximate length 37 Km and thousands of inspection chambers and manholes.
Water Reticulation
The water reticulation with site to all the blocks comprising all pipes and fittings, valves, tees, bends, joints, valve chambers and road crossings. Further, the scope includes fire fighting mains and supplementary water supply and storage consisting of 2 boreholes and a possible 3 more boreholes and a reinforced concrete water storage tank of capacity 1,000,000 litres
The total construction cost was Kshs 10.2 billion.