Design Review of Lomut Bridge and Approach Roads

Review of hydrological calculations and flood estimate, Environmental Impact Assessment Study, review of structural design, preparation of drawings and detailing, cost estimates and tender documents of an 80 m long bridge comprising 2 spans each measuring 40 m, bridge protection works, river training works, and review of geometric designs of 500 m approach roads on either side of the bridge. The project bridge is across River Sighia on Loruk-Barpelo Road (B4)

The Total Construction Cost was Kshs 300 Million