Preliminary & Detailed Engineering Design and Supervision of Pedestrian Crossing (Footbridge) Facilities Across the Thika Superhighway (A2S)-Lot 1 (Kenya School of Monetary Studies [KSMS], Garden City)
Design, preparation of tender documents, tender evaluation, and construction supervision of the Pedestrian Crossing (Footbridge) Facilities Across the Thika Superhighway (A2S) at KSMS and Garden City Location
The Total Construction Cost is Estimated at Kshs 380 Million
[Construction on-going]