Preliminary & Detailed Engineering Design and Supervision of Pedestrian Crossing (Footbridge) Facilities Across the Thika Superhighway (A2S)-Lot 2 (Witeithie, Mangu)
Design, preparation of tender documents, tender evaluation, and construction supervision of theĀ Pedestrian Crossing (Footbridge) Facilities Across the Thika Superhighway (A2S) at Witeithia and Mangu Location
The Total Construction Cost is Estimated at Kshs 400 Million
[Construction on-going]